| Welcome to the China Property Forum, a finance and economics discussion forum focused on Chinese and global housing markets. Please register here or log in below. |
| Construction waste crushing plant process; Construction waste crusher | |
|---|---|
| Tweet Topic Started: 25 Nov 2017, 09:54 AM (17 Views) | |
| crushermachine169 | 25 Nov 2017, 09:54 AM Post #1 |
|
According to the different requirements of the production and processing of construction waste raw materials, the general construction waste crushers can be divided into fixed and mobile construction waste crushers. 1, of which the fixed Construction waste crusher is mainly crusher or cone crusher crushing construction waste, not moving. 2. Mobile construction waste crusher can be divided into conic construction rubbish mill, counterattack construction rubbish crusher, or jaw crusher mobile construction rubbish crusher, there are two kinds of crawler and tire optional, the whole mobile construction rubbish crusher Strong mobility, the whole set crusher, shaker, conveying equipment, feeding equipment in one, a multi-purpose machine, strong performance. Construction waste crushing station process Mobile construction waste crusher can form a complete Construction waste crusher production line, while the fixed needs a combination of a variety of equipment for production, the following fixed construction waste crusher, for example, describes the fixed construction waste crushing production line process: 1, Pretreatment: It is best to pretreat the raw materials of construction waste first, including (optional) using hydraulic hammer to reduce excessively large pieces of material, cutting excessively long steel bars to prevent damage to the conveyor belts, sorting and removing bulk debris, etc. . 2, broken: the use of jaw crusher, impact crusher and other raw materials for crushing, the process can efficiently crushing construction waste, separation of the steel. 3, In addition to iron screening: crushed construction waste through the iron separator will be separated from the iron and steel, sand and gravel through the vibration sieve to form different specifications of the finished sand, stone, a small amount of material that does not meet the fineness requirements Back to construction waste crusher Re-processing, the formation of closed-loop, to ensure the quality of finished products expected. 4, grinding: The construction waste crushing process is optional, if the user needs the finished product for the smaller size of the powder, the mill can be used to crush the construction waste for further processing. |
View Profile |
"REPLY" Go to top |
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
| « Previous Topic · 888 Significant Investor Visa Australia Forum · Next Topic » |


8:49 AM Jul 11